Trade · 6 min
EUDR compliance for Indian coffee exporters: what you need to do before 30 December 2025
The EU Deforestation Regulation (EUDR) is mandatory for all coffee, cocoa, palm oil, soya, wood and cattle products entering the EU and UK from 30 December 2025 — regardless of whether the shipment is by sea or air. Indian coffee exporters supplying EU or UK roasters must prepare now.

Quick answer
EUDR requires Indian coffee exporters to provide: (1) GPS polygon coordinates of every plot where the coffee was grown, proving it was not deforested after 31 December 2020; (2) a due-diligence statement uploaded to the EU information system before customs clearance; (3) evidence that the coffee was produced in compliance with the laws of the country of production. Versa International Traders prepares EUDR documentation for all coffee lots exported to EU and UK buyers. Contact +91 97464 33133.
What EUDR requires for Indian coffee exports
- Traceability to plot level: the coffee must be traceable to the specific farms/plots where it was grown — not just the country or region
- GPS coordinates: polygon coordinates (or at minimum centroid point coordinates) for each farm plot, with area
- No deforestation after 31 December 2020: the plots must not have been established on land deforested or degraded after 31/12/2020
- Legal compliance: the coffee was produced in accordance with Indian law (land rights, environmental, labour, human rights)
- Due-diligence statement: a formal statement submitted to the EU EUDR information system before each consignment clears EU/UK customs
- Risk assessment: a documented assessment of the risk of EUDR non-compliance for the specific origin and supply chain
How EUDR affects Indian coffee grades
- All Arabica grades: Plantation AA/AB, Arabica Cherry, MNEB — all must be EUDR-compliant for EU/UK
- All Robusta grades: Parchment AB, Cherry AB — EUDR applies equally to Robusta
- Monsooned Malabar: also covered — no exemption for processing method
- Indian coffee estates: shade-grown Karnataka and Kerala estates have low deforestation risk — the land has been under coffee cultivation for generations
- Documentation challenge: the work is in gathering GPS data and legal land records from individual estate owners and cooperatives
What Indian exporters must do before 30 December 2025
- Register as an operator or trader on the EU EUDR information system
- Collect GPS coordinates from every farm supplying your export lots — start now, this takes time
- Obtain land title or lease documents for each farm
- Complete the risk assessment for your Indian supply chain
- Prepare a due-diligence statement template for your standard export lots
- Update buyer contracts to include EUDR documentation as a delivery condition
- For UK: UK EUDR mirrors EU EUDR — same requirements, separate submission to UK competent authority
Frequently asked questions
Does EUDR apply to Indian coffee exported by air as well as sea?
Yes. EUDR applies to all coffee entering the EU or UK regardless of transport mode — sea freight and air cargo are equally covered. Even a 1 kg sample sent by courier to a EU buyer requires EUDR compliance from 30 December 2025.
Can Versa International Traders provide EUDR documentation with Indian coffee shipments?
Yes. Versa International Traders prepares EUDR due-diligence documentation — GPS coordinates, land records, risk assessment, due-diligence statement — for all coffee lots exported to EU and UK buyers. Contact +91 97464 33133.

